SDDP Local Authorities Nicosia I: Difference between revisions

From Future Worlds Center Wiki
Jump to navigationJump to search
No edit summary
No edit summary
Line 12: Line 12:
|n_k_st=N=66  V=37  ST=52% SCI=2.35
|n_k_st=N=66  V=37  ST=52% SCI=2.35
|dates=1-2 Feb, 2010
|dates=1-2 Feb, 2010
|link=[http://www.localauthoritiescyprus.info/nicosia_BOOKLET_2010_02_28.pdf Download Report]
|link=[[Media:nicosia_BOOKLET_2010_02_28.pdf|Download Report]]
}}
}}



Revision as of 01:44, 4 May 2018

SDDP Local Authorities Nicosia I
SDDP Local Authorities Nicosia I
Report Title SDDP Report between Members of the Communities of Nicosia Area Local Authorities
Gr:Έκθεση Πορισμάτων Εργαστηρίου Δομημένου Διαλόγου Μελών Τοπικής Αυτοδιοίκησης Δήμων της Λευκωσίας
Project Diagnosis of training and development needs for the local authorities of the Cyprus Republic
Gr: Παροχή υπηρεσιών διάγνωσης αναγκών μάθησης και ανάπτυξης στους οργανισμούς τοπικής αυτοδιοίκησης της Κυπριακής Δημοκρατίας
Triggering Question What factors constrain the efficient operation of local governance?
Gr: Τι περιορίζει την αποτελεσματική λειτουργία της τοπικής αυτοδιοίκησης;
Dates 1-2 Feb, 2010
Author(s) Aleco Christakis
Lawrence Kalogreades
Antonis Loizou
Future Worlds Center
Editor(s) Marios Michaelides
Marios Constantinou
Vasos Savvides
Cyprus Academy of Public Administration
Total Duration 16 hrs
Download Download Report



Executive Summary

The Nicosia I Co-Laboratory was part of 10 Structured Dialogic Design Process (SDDP) Co_laboratories, which took place between December 2009 and February 2010 all over Cyprus in the context of Learning and Development Needs for Cypriot Local Authorities and were implemented by Future Worlds Center.

The Nicosia I co-Laboratory was one of the 10 and took place at the Hilton Park Hotel (Nicosia) between 1-2 February, 2010.

The implementation of 10 structured dialogues with the aim to provide a diagnosis of training and development needs for the local authorities of Cyprus, was part of a larger Government project.

The tender was implemented by a consortium of three partners:

External Links

References


Tender number: 4/2009; Contract number: 6/2009